Project management & project controls services
One team for the whole schedule lifecycle — from the proposal to the last shift.
We build the schedule, load it with manpower, baseline it, and report it with S-curves and earned value — in the format your client, lender or owner's engineer expects.
Level 2
Proposal & bid schedules
Win-ready schedules for RFPs and tenders: key milestones, EPC or fabrication phases, a manpower histogram with peaks and valleys, and a basis-of-schedule narrative — formatted to the bid's requirements and built to the bid deadline.
- Milestone & phase logic that survives client review
- Resource histogram + man-hour summary
- Narrative and assumptions page
Level 3 baseline
EPC schedules — engineering, procurement & construction
Execution baselines that tie engineering deliverables, purchase orders and vendor lead times (PO → ETA) to construction — with rules of credit, Physical % Complete and a frozen baseline you can be measured against.
- Build → link → PO ETA → freeze (B1 / B2)
- Rules-of-credit weightings per discipline
- Progress measurement set up for EVM
Shop floor
Fabrication schedules
Work-package schedules for fabricators and shops: cut, fit, weld, NDT, paint, ship — loaded with man-hours per trade so you can see the crew you need each week and promise delivery dates you can keep.
- Work-package & spool / assembly level
- Trade man-hour loading & look-aheads
- Delivery-date commitments backed by logic
Level 5 · shift-level
Outage, shutdown & turnaround packages
Hour-by-hour outage schedules for heavy equipment and plant shutdowns, with day-shift and night-shift manpower plans, daily progress reports and revision control — the full package, as delivered on real mining-equipment outages.
- Shift-level Gantt + Excel version for the client
- Day / night crew histograms with peak curve
- Daily progress report templates (day & night)
Reporting
Progress reporting, S-curves & earned value
Weekly and monthly reporting that owners trust: planned vs earned vs actual S-curves, SPI and CPI, variance explanations, 4-week look-aheads and a clean PDF report pack — reported on Performance % Complete, never Schedule %.
- Auto-generated Excel S-curves from P6 or MS Project
- SPI / CPI / EAC with plain-English narrative
- Power BI dashboards when you want them live
Recovery
Schedule health, recovery & delay analysis
When a schedule is slipping, we find out why — logic checks, float erosion, critical-path and what-if analysis — and build the recovery schedule or time-impact analysis you need for the conversation with the client.
- Schedule health & logic audit
- What-if, impact & recovery scenarios
- Claims-ready time-impact analysis
On site · boots on the ground
Primavera P6 implementation at your site
We stand up P6 for your company or project and make it usable: EPS / OBS, calendars, activity and resource codes, WBS and schedule templates, layouts, filters and reports, global data standards — then we train your planners on it, at your office or project.
- Enterprise setup & standards (EPS, OBS, codes, calendars)
- Templates, layouts & report pack your client accepts
- Hands-on training for your team at your site
Request P6 implementation
Ongoing
P6 management & scheduling support
We run your P6 environment and your schedules month after month: progress updates, baselines and re-baselines, user and project admin, data checks, look-aheads and the report pack — a scheduling desk your project managers can call, without adding headcount.
- Weekly / monthly update cycles with QA checks
- Baseline control (B1 / B2) & change log
- Admin, users, templates & report pack
Request P6 management
Reporting system
Project controls & dashboard setup
We design the project-controls system behind the schedule: progress measurement and rules of credit, cost / schedule integration, manpower tracking, and Power BI or Excel dashboards that refresh from P6, MS Project and your cost and timesheet data — one page your management actually reads.
- Progress measurement & EVM setup
- Power BI / Excel dashboards connected to P6 and cost data
- Procedures, templates & handover training
Request dashboard setup
01Brief
Send the scope, drawings or RFP and your deadline. We reply on WhatsApp with what we need and when you'll have it.
02Build
WBS, activities, logic, durations, calendars and resources in P6 or MS Project — reviewed with you before it goes anywhere.
03Baseline
Link procurement ETAs, set rules of credit and EV settings, then freeze the baseline you will be measured against.
04Report
Weekly updates, S-curves, SPI / CPI, look-aheads and the PDF pack — or we train your team to run it themselves.